Rye Park Wind Farm

  • Project Status:  Under Construction
  • Maximum Capacity:  396 MW
  • Annual Output:  1,188 GWh
  • Location:  Rye Park, New South Wales
View the Project

Asset & Development Directory

Snowtown Wind Farm / Stage 1

  • Maximum capacity:  101 MW
  • Annual output:  357 GWh
  • Commissioned:  2008
  • Location:  Snowtown, South Australia
View Project

Blayney Wind Farm

  • Maximum capacity:  10 MW
  • Annual output:  18 GWh
  • Commissioned:  2000
  • Location:  Carcoar Lake, New South Wales
View Project

Crookwell Wind Farm

  • Maximum capacity:  5 MW
  • Annual output:  8 GWh
  • Commissioned:  1998
  • Location:  Goulburn, New South Wales
View Project

Salt Creek Wind Farm

  • Project Status:  Operational
  • Maximum capacity:  54 MW
  • Annual output:  172 GWh
  • Commissioned:  July 2018
  • Location:  5km south of Woorndoo, Victoria
View Project

Dundonnell Wind Farm

  • Project Status:  Under construction
  • Maximum Capacity:  336MW
  • Location:  23km north-east of Mortlake, Victoria
  • Turbines:  80 turbines
  • Blade Tip Height:  189m
  • Transmission Connection:  38km of 220kV overhead transmission line and a new substation
View Project

Palmer Wind Farm

  • Maximum capacity:  300 MW (proposed)
  • Annual output:  1,300 GWh (proposed)
  • Location:  50km east of Adelaide, South Australia
View Project

Rye Park Wind Farm

  • Project Status:  Under Construction
  • Maximum Capacity:  396 MW
  • Annual Output:  1,188 GWh
  • Location:  Rye Park, New South Wales
View Project

Waddi Wind Farm & Solar Farm

  • Maximum capacity:  Up to 170 MW (Wind) & 40 MW (solar)
  • Location:  15km north-west of Dandaragan, Western Australia
View Project

Snowtown North Solar Farm

  • Maximum capacity:  Up to 45 MW
  • Location:  Snowtown, South Australia
View Project

Dysart Solar Farm

  • Maximum capacity:  Up to 100 MW
  • Location:  200km Southwest of Mackay, Queensland
View Project

Liverpool Range Wind Farm

  • Project Status:  In Development
  • Maximum Capacity:  Approx. 1,000MW (Approved Project)
    Approx. 1,320MW (Modified Project)
  • Location:  370 km north-west of Sydney
  • Turbines:  Up to 267 wind turbines (Approved Project)
    Up to 220 wind turbines (Modified Project)
View Liverpool Range Wind Farm Project

Illabo Solar Farm

  • Project Status:  On hold
  • Maximum capacity:  80MW
  • Location:  Six kilometres south-east of Illabo and 50 kilometre north-east of Wagga Wagga
View Project

Bushy Creek Wind Farm

  • Project Status:  In Development
  • Maximum Capacity:  Up to 150 MW (proposed)
  • Location:  6km north-west of Chatsworth, Victoria
  • Turbines:  Up to 24
  • Blade Tip Height:  Up to 250m
  • Transmission Connection:  27km of 66kV single circuit transmission line
View Project

Dalvui BESS

  • Project Status:  In Development
  • Indicative Capacity:  196 MW / 392 MWh
  • Location:  Terang, Victoria
View Project

Latrobe Valley BESS

  • Project Status:  In Development
  • Indicative Capacity:  203 MW / 812 MWh
  • Location:  Morwell, Victoria
View Project

Silverton Wind Farm

  • Project Status:  Operational
  • Maximum capacity:  199 MW
  • Annual output:  779 GWh
  • Commissioned:  May 2021
  • Location:  25km from Broken Hill, NSW; ~400km north east of Adelaide, SA
View Project

Nyngan Solar Farm

  • Project Status:  Operational
  • Maximum capacity:  102 MW
  • Annual output:  226 GWh
  • Commissioned:  July 2015
  • Location:  10km West of Nyngan, NSW (500km NW of Sydney)
View Project

Coopers Gap Wind Farm

  • Project Status:  Under construction
  • Maximum capacity:  453 MW
  • Annual output:  1,515 GWh
  • Location:  Western Downs, QLD (65km N of Dalby; ~180km NW of Brisbane)
View Project

Broken Hill Solar Farm

  • Project Status:  Operational
  • Maximum capacity:  53 MW
  • Annual output:  124 GWh
  • Commissioned:  December 2015
  • Location:  Broken Hill, NSW (SW corner of NSW, ~400km NE of Adelaide, SA)
View Project